Wellcome to National Portal
মেনু নির্বাচন করুন
Main Comtent Skiped

Nonways

Table of Names of the 1st Phase Project of the Non-Wage Section

1. Construction of guard wall at Abul Hossain Headmaster Road, Matinpukurpara. ৮৬000.00

2. Construction of Puranatewariganjurullah Godown Road Guide Wall 200,000.00

3. Construction of culverts on the roads of Chhabusardar Jamemsjid 150000.00

4. Construction of Forkaniar Side Guide Wall at Salimuddin Road at the foot of Steel Pole 150,000.00

5. Construction of guide wall on the sidewalk in Dewanjibarishamal water 150000.00

6. Construction of culvert on the side road in front of Ezzaman School 150,000.00